{"id":3946,"date":"2025-07-28T14:36:50","date_gmt":"2025-07-28T07:36:50","guid":{"rendered":"https:\/\/onggiosaoviet.vn\/?p=3946"},"modified":"2025-08-29T12:07:41","modified_gmt":"2025-08-29T05:07:41","slug":"toi-uu-chi-phi-he-thong-quat-gio-giai-phap-tiet-kiem-20-tu-kinh-nghiem-thuc-te","status":"publish","type":"post","link":"https:\/\/onggiosaoviet.vn\/en\/toi-uu-chi-phi-he-thong-quat-gio-giai-phap-tiet-kiem-20-tu-kinh-nghiem-thuc-te\/","title":{"rendered":"Optimizing the cost of ventilation system: 20% saving solution from practical experience"},"content":{"rendered":"<h1 class=\"text-2xl font-bold mt-1 text-text-200\">OPTIMIZING COSTS OF VENTILATION SYSTEM: SAVING SOLUTIONS 20% FROM PRACTICAL EXPERIENCE<\/h1>\n<h1 class=\"text-2xl font-bold mt-1 text-text-200\">In the current economic context, optimizing investment costs for industrial ventilation systems is a top concern for many businesses. Through many years of experience in the field of construction and installation of duct systems, we have discovered a simple but effective solution that helps save up to 20% in fan investment costs.<\/h1>\n<p class=\"whitespace-pre-wrap break-words\"><img decoding=\"async\" src=\"https:\/\/dieuhoasaoviet.vn\/upload\/images\/z6307100802553_2c0ab16b6d9e867b2f7ed04e013243aa.jpg\" alt=\"\" \/><\/p>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">Findings From Actual Construction<\/h2>\n<p class=\"whitespace-pre-wrap break-words\">During the construction of projects, we have noticed a common but often overlooked problem: the tightness of duct joints. Initially, many construction units, including us, often do not pay much attention to this issue. However, through actual operation, we have discovered its significant impact on the performance of the entire system.<\/p>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">Causes of Energy Waste<\/h2>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">1. Leak at the Joint<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">The connecting flanges are not properly treated.<\/li>\n<li class=\"whitespace-normal break-words\">Small gap at the joint<\/li>\n<li class=\"whitespace-normal break-words\">Large number of joints throughout the pipeline<\/li>\n<\/ul>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">2. Consequences of Leakage<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Reduce pressure in the system<\/li>\n<li class=\"whitespace-normal break-words\">Air speed at the outlet does not meet the requirements<\/li>\n<li class=\"whitespace-normal break-words\">Fan energy waste<\/li>\n<li class=\"whitespace-normal break-words\">Increased operating costs<\/li>\n<\/ul>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\"><img decoding=\"async\" src=\"https:\/\/dieuhoasaoviet.vn\/upload\/images\/z6307100793225_6288cf3b4d6f8e1577c3aa9439eea9ec(1).jpg\" alt=\"\" \/><\/h2>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">The Optimal Solution<\/h2>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">1. Technical Processing<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Check all joints carefully before installation.<\/li>\n<li class=\"whitespace-normal break-words\">Use specialized glue to seal tightly.<\/li>\n<li class=\"whitespace-normal break-words\">Apply strict quality control process<\/li>\n<\/ul>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">2. Implementation Process<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Clean the joint surface<\/li>\n<li class=\"whitespace-normal break-words\">Apply glue evenly and correctly<\/li>\n<li class=\"whitespace-normal break-words\">Check the tightness after installation<\/li>\n<li class=\"whitespace-normal break-words\">Test before delivery<\/li>\n<\/ul>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">Results Achieved<\/h2>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">1. Technical Efficiency<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Wind speed meets design requirements<\/li>\n<li class=\"whitespace-normal break-words\">Stable system pressure<\/li>\n<li class=\"whitespace-normal break-words\">Minimize pressure loss<\/li>\n<li class=\"whitespace-normal break-words\">Increase fan performance<\/li>\n<\/ul>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">2. Economic Efficiency<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Reduces fan power required by 20%<\/li>\n<li class=\"whitespace-normal break-words\">Save initial investment costs<\/li>\n<li class=\"whitespace-normal break-words\">Reduce long-term operating costs<\/li>\n<li class=\"whitespace-normal break-words\">Optimize maintenance costs<\/li>\n<\/ul>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">Lessons Learned<\/h2>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">1. In Design<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Calculate fan power accurately<\/li>\n<li class=\"whitespace-normal break-words\">Do not design excess capacity.<\/li>\n<li class=\"whitespace-normal break-words\">Attention to joint technical details<\/li>\n<li class=\"whitespace-normal break-words\">Choosing the right material<\/li>\n<\/ul>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">2. During Construction<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Train technicians on installation procedures<\/li>\n<li class=\"whitespace-normal break-words\">Quality control at every stage<\/li>\n<li class=\"whitespace-normal break-words\">Invest time in joint treatment<\/li>\n<li class=\"whitespace-normal break-words\">Regularly check during installation<\/li>\n<\/ul>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">Long Term Benefits<\/h2>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">1. For Customers<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Save investment costs<\/li>\n<li class=\"whitespace-normal break-words\">Reduce operating costs<\/li>\n<li class=\"whitespace-normal break-words\">Stable operating system<\/li>\n<li class=\"whitespace-normal break-words\">Increase equipment life<\/li>\n<\/ul>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">2. For Contractors<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Enhance brand reputation<\/li>\n<li class=\"whitespace-normal break-words\">Increase customer satisfaction<\/li>\n<li class=\"whitespace-normal break-words\">Reduce warranty and maintenance costs<\/li>\n<li class=\"whitespace-normal break-words\">Optimize construction process<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/dieuhoasaoviet.vn\/upload\/images\/z6307100811962_c5114a302220ffa38da9e237e9479d2a.jpg\" alt=\"\" \/><\/p>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">Recommendations for Business<\/h2>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">1. Before Investing<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Consult an expert<\/li>\n<li class=\"whitespace-normal break-words\">Choose a reputable contractor<\/li>\n<li class=\"whitespace-normal break-words\">Carefully evaluate the design options<\/li>\n<li class=\"whitespace-normal break-words\">Cost-benefit calculation<\/li>\n<\/ul>\n<h3 class=\"text-lg font-bold text-text-200 mt-1 -mb-1.5\">2. During Implementation<\/h3>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Closely monitor the construction process<\/li>\n<li class=\"whitespace-normal break-words\">Requires thorough testing<\/li>\n<li class=\"whitespace-normal break-words\">Note for future maintenance<\/li>\n<li class=\"whitespace-normal break-words\">Operator training<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/dieuhoasaoviet.vn\/upload\/images\/z6307100803106_17e7ffa26b062eb1ab6f8365c2e45332.jpg\" alt=\"\" \/><\/p>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">Conclude<\/h2>\n<p class=\"whitespace-pre-wrap break-words\">Investing time and effort in duct joint engineering may be costly initially, but it pays off in the long run. Saving 20% in fan costs is not just a number, it is a testament to the importance of attention to detail in construction.<\/p>\n<h2 class=\"text-xl font-bold text-text-200 mt-1 -mb-0.5\">Contact Information<\/h2>\n<p class=\"whitespace-pre-wrap break-words\">Sao Viet Air Duct Manufacturing and Trading Company Limited<\/p>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Address: 267 Le Thanh Tong, May Chai, Ngo Quyen, Hai Phong<\/li>\n<li class=\"whitespace-normal break-words\">Website:\u00a0<a class=\"underline\" href=\"http:\/\/www.dieuhoasaoviet.vn\/\">www.dieuhoasaoviet.vn<\/a><\/li>\n<\/ul>\n<p class=\"whitespace-pre-wrap break-words\">Hotline:<\/p>\n<ul class=\"[&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc space-y-1.5 pl-7\">\n<li class=\"whitespace-normal break-words\">Mr. Viet: 0822.555.659<\/li>\n<li class=\"whitespace-normal break-words\">Ms. Giang: 0934.559.168<\/li>\n<li class=\"whitespace-normal break-words\">Ms. Hang: 0985.239.838<\/li>\n<\/ul>\n<p class=\"whitespace-pre-wrap break-words\">Please contact us immediately for detailed advice on cost-effective solutions for your ventilation system. Sao Viet - A trusted partner in the field of industrial ventilation ducts.<\/p>\n<p class=\"whitespace-pre-wrap break-words\">#onggiosaoviet #pccc #khucongnghiep<\/p>","protected":false},"excerpt":{"rendered":"<p>OPTIMIZING COSTS FOR VENTILATION SYSTEMS: COST-SAVING SOLUTIONS FROM PRACTICAL EXPERIENCE In the current economic climate, optimizing investment costs for industrial ventilation systems is a top priority for many businesses. Over the years, [\u2026]<\/p>","protected":false},"author":1,"featured_media":3947,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3946","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"_links":{"self":[{"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/posts\/3946","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/comments?post=3946"}],"version-history":[{"count":2,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/posts\/3946\/revisions"}],"predecessor-version":[{"id":5013,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/posts\/3946\/revisions\/5013"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/media\/3947"}],"wp:attachment":[{"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/media?parent=3946"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/categories?post=3946"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/tags?post=3946"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}