{"id":6223,"date":"2026-10-28T08:23:00","date_gmt":"2026-10-28T01:23:00","guid":{"rendered":"https:\/\/onggiosaoviet.vn\/?p=6223"},"modified":"2026-10-30T11:30:40","modified_gmt":"2026-10-30T04:30:40","slug":"kiem-soat-sai-khac-giua-ban-ve-va-thuc-te-khi-gia-cong-ong-gio","status":"publish","type":"post","link":"https:\/\/onggiosaoviet.vn\/en\/kiem-soat-sai-khac-giua-ban-ve-va-thuc-te-khi-gia-cong-ong-gio\/","title":{"rendered":"Control discrepancies between drawings and actual fabrication of air ducts."},"content":{"rendered":"<p class=\"wp-block-paragraph\">Discrepancies between drawings and the actual condition are one of the reasons why fabricated components cannot be installed as planned. This can arise when structural dimensions change, ceiling heights are adjusted, or drawings between different disciplines are not fully coordinated. Strict management of input information helps minimize rework and delays.<\/p>\n\n\n<figure class=\"wp-block-post-featured-image\"><img fetchpriority=\"high\" decoding=\"async\" width=\"2048\" height=\"1365\" src=\"https:\/\/onggiosaoviet.vn\/wp-content\/uploads\/2026\/03\/Anh-Bai-2-thang-3-1.jpg\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" style=\"object-fit:cover;\" srcset=\"https:\/\/onggiosaoviet.vn\/wp-content\/uploads\/2026\/03\/Anh-Bai-2-thang-3-1.jpg 2048w, https:\/\/onggiosaoviet.vn\/wp-content\/uploads\/2026\/03\/Anh-Bai-2-thang-3-1-300x200.jpg 300w, https:\/\/onggiosaoviet.vn\/wp-content\/uploads\/2026\/03\/Anh-Bai-2-thang-3-1-1024x683.jpg 1024w, https:\/\/onggiosaoviet.vn\/wp-content\/uploads\/2026\/03\/Anh-Bai-2-thang-3-1-768x512.jpg 768w, https:\/\/onggiosaoviet.vn\/wp-content\/uploads\/2026\/03\/Anh-Bai-2-thang-3-1-1536x1024.jpg 1536w, https:\/\/onggiosaoviet.vn\/wp-content\/uploads\/2026\/03\/Anh-Bai-2-thang-3-1-18x12.jpg 18w, https:\/\/onggiosaoviet.vn\/wp-content\/uploads\/2026\/03\/Anh-Bai-2-thang-3-1-600x400.jpg 600w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\">1. Common causes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Possible causes include using outdated drawings, missing elevation information, equipment size changes, and intersections with other structures or MEP systems. Additionally, changes exchanged through multiple channels without being updated in the official documentation can lead to inconsistent information for the production team.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. Verify data before production.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before production begins, it is necessary to clearly define the drawing code and version, scope of area, dimensions, materials, and special details. For locations with potential conflicts, confirmation from the engineering department or on-site survey should be requested according to project procedures.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">3. Managing changes after placing an order<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When changes occur, the content, affected location, new version, and approver must be documented. Components already manufactured or in transit should be assessed separately to determine the appropriate course of action. A brief change notification without accompanying drawings or dimensions should not be sent.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">4. Drawing and Change Control Panel<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The table below can be used as a log for controlling input data.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Step<\/strong><\/td><td><strong>Information to be recorded<\/strong><\/td><td><strong>Coordinating person\/department<\/strong><\/td><\/tr><tr><td>Receive the drawings<\/td><td>File name, drawing code, version, release date<\/td><td>Project Management\/Coordination<\/td><\/tr><tr><td>Pre-production review<\/td><td>Size, material, accessories, intersection location<\/td><td>Engineering and manufacturing<\/td><\/tr><tr><td>On-site verification<\/td><td>Actual dimensions at the point to be inspected<\/td><td>Construction supervisor\/team leader<\/td><\/tr><tr><td>Changes occur.<\/td><td>Content, causes, and scope of impact<\/td><td>Design firm and contractor<\/td><\/tr><tr><td>Close the file<\/td><td>Final version, processing status, related components<\/td><td>The parties follow the project process.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Discrepancy control is not just about re-measuring dimensions, but also about version management and approval flows. A clear process helps contractors and manufacturers use the same data set, reducing wasted materials and effort.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Contact Sao Viet Air Ducting<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Sao Viet Air Ducting recommends that customers submit confirmed drawings along with the Bill of Quantities (BOQ) when placing fabrication orders. For locations with special installation conditions, it is advisable to discuss and agree on the input data beforehand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>SAO VIET AIR DUCT MANUFACTURING AND TRADING COMPANY LIMITED<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Address: 267 Le Thanh Tong, May Chai, Hai Phong<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hanoi Representative Office: No. 19, Lane 24, Kim Dong Street, Giap Bat Ward, Hoang Mai District, Hanoi<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hotline: 0815.999.826 \u2013 0934.559.168 | Technical support: 0949.852.886<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Email: vietonggio@gmail.com<\/p>","protected":false},"excerpt":{"rendered":"<p>Sai kh\u00e1c gi\u1eefa b\u1ea3n v\u1ebd v\u00e0 hi\u1ec7n tr\u1ea1ng l\u00e0 m\u1ed9t trong nh\u1eefng nguy\u00ean nh\u00e2n khi\u1ebfn c\u1ea5u ki\u1ec7n \u0111\u00e3 gia c\u00f4ng kh\u00f4ng th\u1ec3 l\u1eafp \u0111\u1eb7t nh\u01b0 d\u1ef1 ki\u1ebfn. \u0110i\u1ec1u n\u00e0y c\u00f3 th\u1ec3 ph\u00e1t sinh khi k\u00edch th\u01b0\u1edbc k\u1ebft c\u1ea5u thay \u0111\u1ed5i, cao \u0111\u1ed9 tr\u1ea7n \u0111\u01b0\u1ee3c \u0111i\u1ec1u ch\u1ec9nh ho\u1eb7c b\u1ea3n v\u1ebd gi\u1eefa c\u00e1c b\u1ed9 m\u00f4n ch\u01b0a \u0111\u01b0\u1ee3c [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":5478,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[572,574,374,575,573],"class_list":["post-6223","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc","tag-dat-hang-ong-gio","tag-do-dac-hien-truong","tag-gia-cong-ong-gio-theo-ban-ve","tag-kiem-soat-ban-ve-hvac","tag-thay-doi-thiet-ke-mep"],"_links":{"self":[{"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/posts\/6223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/comments?post=6223"}],"version-history":[{"count":1,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/posts\/6223\/revisions"}],"predecessor-version":[{"id":6224,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/posts\/6223\/revisions\/6224"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/media\/5478"}],"wp:attachment":[{"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/media?parent=6223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/categories?post=6223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/onggiosaoviet.vn\/en\/wp-json\/wp\/v2\/tags?post=6223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}