HOW TO INSTALL INDUSTRIAL AIR CONDITIONING?
Industrial air conditioning Air conditioners are indispensable equipment for factories, export processing zones and industrial parks... They are modern and expensive equipment, so choosing and installing air conditioners is very important.
.png)
First we need to determine the location to install the industrial air conditioner.
Location air conditioning installation Usually fixed, it is closely linked to the design and engineering of the project, so the installation must be carefully studied and calculated from the design stage: choosing the machine so that the capacity is suitable for the area and operating conditions of the project, in addition, we need to pay attention to the form and technical requirements of the wiring system, pipes... then the electrical system, drainage system to have a synchronous and suitable architectural - technical design solution.
After having the design and estimate for the whole project, we proceed with the installation. During the construction process, installation divided into two stages:
1. First stage: We must determine the exact location of the machine, then proceed to run copper pipes + insulation, water pipes, it is necessary to note that depending on the type of machine, we need to wait for the power source in the hot or cold unit, or we can run extra wires (wrapped along the insulation pipe) to allow power connection at both ends. Industrial air conditioners are devices with large power consumption, so they must have their own safety devices such as circuit breakers or circuit breakers.
2. Second phase: Install the machine, this phase requires us to position the condenser, evaporator, connect the insulation pipe system, signal wire, power wire, drainage line to the device. After completing the two phases, we test run the machine and accept it.

Notes when installing industrial air conditioners:
1. The installation location must be easy to operate.
2. Choose a suitable and space-saving location for the cold panel. Install the cold panel in a place where it can be connected to the outdoor unit most easily.
3. If possible, do not install the outdoor unit where it will be exposed to direct sunlight.
4. Do not install the outdoor unit in a place with strong winds or lots of dust.
5. Do not place the outdoor unit in a place with a lot of traffic.
6. Do not place the outdoor unit directly on the ground.

Industrial air conditioning installation in Hai Duong
—————————————————————————————-
For more information please contact:
Sao Viet Air Conditioning Technology Joint Stock Company
267 Le Thanh Tong, May Chai, Ngo Quyen, Hai Phong
Phone: 0225 3 567 618
Hotline: Mr. Viet 0983 260 704
Email: dieuhoasaoviet@gmail.com
Facebook: https://www.facebook.com/dieuhoasaoviet68/notifications/