HOW TO REDUCE SHEET METAL LOSS DURING THE FABRICATION OF SAO VIET AIR DUCTS?

In large-scale projects, even a slight increase in material waste can result in significant cost savings.

Therefore, material optimization needs to start with input data and production plans.

1. Accurate separation

If the Bill of Quantities (BOQ) is incorrect, the quantity of materials ordered may also be wrong.

The contractor needs to check:

  • Size.
  • Quantity.
  • Length.
  • Generic.
  • Revise.

2. Optimize the cutting method.

Proper placement of details on the material helps to minimize excess material.

3. Grouping similar details

Parts with similar dimensions or constructions can be produced in batches.

SolutionBenefit
Accurate breakdownAvoid overordering.
Optimize the cutting pattern.Reduce excess materials.
Product groupIncrease efficiency
Revision controlAvoid remanufacturing.
MSReduce defective products

4. Revision changes are a major source of losses.

A product manufactured according to the old drawing but no longer conforming to the new drawing can still result in additional costs.

Therefore, locking in revisions before production is crucial.

5. Sao Viet Air Ducts and the Production Optimization Challenge

For large orders, contractors should submit a well-controlled set of documents to Sao Viet Air Duct Production can be organized according to appropriate volume and schedule.

Conclusion

Reducing material loss does not mean reducing material quality. The goal is... Use materials more efficiently through accurate data and good manufacturing processes..

Sao Viet Air Duct It has the capability to fabricate various types of air ducts, giving contractors more options when implementing HVAC systems.

SAO VIET AIR DUCT MANUFACTURING AND TRADING COMPANY LIMITED

  • Address: 267 Le Thanh Tong, May Chai, Ngo Quyen, Hai Phong
  • Hotline: 0815.999.826 – 0934.559.168
  • E-mail: vietonggio@gmail.com

same topic