Discrepancies between drawings and the actual condition are one of the reasons why fabricated components cannot be installed as planned. This can arise when structural dimensions change, ceiling heights are adjusted, or drawings between different disciplines are not fully coordinated. Strict management of input information helps minimize rework and delays.

1. Common causes
Possible causes include using outdated drawings, missing elevation information, equipment size changes, and intersections with other structures or MEP systems. Additionally, changes exchanged through multiple channels without being updated in the official documentation can lead to inconsistent information for the production team.
2. Verify data before production.
Before production begins, it is necessary to clearly define the drawing code and version, scope of area, dimensions, materials, and special details. For locations with potential conflicts, confirmation from the engineering department or on-site survey should be requested according to project procedures.
3. Managing changes after placing an order
When changes occur, the content, affected location, new version, and approver must be documented. Components already manufactured or in transit should be assessed separately to determine the appropriate course of action. A brief change notification without accompanying drawings or dimensions should not be sent.
4. Drawing and Change Control Panel
The table below can be used as a log for controlling input data.
| Step | Information to be recorded | Coordinating person/department |
| Receive the drawings | File name, drawing code, version, release date | Project Management/Coordination |
| Pre-production review | Size, material, accessories, intersection location | Engineering and manufacturing |
| On-site verification | Actual dimensions at the point to be inspected | Construction supervisor/team leader |
| Changes occur. | Content, causes, and scope of impact | Design firm and contractor |
| Close the file | Final version, processing status, related components | The parties follow the project process. |
Conclusion
Discrepancy control is not just about re-measuring dimensions, but also about version management and approval flows. A clear process helps contractors and manufacturers use the same data set, reducing wasted materials and effort.
Contact Sao Viet Air Ducting
Sao Viet Air Ducting recommends that customers submit confirmed drawings along with the Bill of Quantities (BOQ) when placing fabrication orders. For locations with special installation conditions, it is advisable to discuss and agree on the input data beforehand.
SAO VIET AIR DUCT MANUFACTURING AND TRADING COMPANY LIMITED
Address: 267 Le Thanh Tong, May Chai, Hai Phong
Hanoi Representative Office: No. 19, Lane 24, Kim Dong Street, Giap Bat Ward, Hoang Mai District, Hanoi
Hotline: 0815.999.826 – 0934.559.168 | Technical support: 0949.852.886
Email: vietonggio@gmail.com