Detailed process of manufacturing square air ducts in air conditioning systems

DETAILED PROCESS OF PRODUCING SQUARE AIR DUCT IN AIR CONDITIONING SYSTEM

1. Prepare materials and tools

Main materials:

  • Galvanized sheet metal Thickness from 0.48mm to 1.2mm
  • Silicone glue specialized for air ducts
  • Thanh V (for joints)
  • Self-drilling screws
  • Glue specialized
  • Aluminum tape specialized
  • Insulation foam PE or EPDM

Tools and equipment:

  • Industrial sheet metal cutting machine
  • Corrugated iron beveling machine
  • Corner punching machine
  • Pliers, hammer, chisel
  • Measuring tape and marking pen
  • Drill and screwdriver
  • Specialized foam cutting scissors

2. Measurement and design process

Step 1: Survey and measure

  • Determine the size of the duct to be produced
  • Measure required length and width
  • Record detailed parameters
  • Calculate the required slope

Step 2: Design and calculation

  • Drawing detailed designs
  • Calculate the amount of materials needed
  • Locate the joints
  • Design of shock absorber system (if required)

3. Cutting and shaping process

Step 1: Mark and cut the sheet metal

  • Mark the size on the sheet metal
  • Cut the sheet metal according to the marked size
  • Check the accuracy of the cuts

Step 2: Create the fold

  • Fold the edge of the corrugated iron sheet at a 90 degree angle
  • Create seams
  • Check squareness

Step 3: Punch the corners and shape

  • Punching corners at joints
  • Create stiffeners (if needed)
  • Check for stiffness and stability

4. Insulation foam wrapping process

Step 1: Prepare the foam

  • Measure and cut foam to size
  • Cleaning the corrugated iron surface
  • Prepare the glue

Step 2: Stick the foam

  • Apply glue evenly to the surface of the corrugated iron.
  • Carefully stick the foam layer by layer.
  • Make sure there are no air bubbles.

Step 3: Foam joint treatment

  • Glue foam joints
  • Use reinforced aluminum tape
  • Check the tightness of the insulation

5. Assembly and finishing process

Step 1: Assemble the components

  • Assemble the prepared corrugated iron pieces
  • Install V-bars at the joints
  • Tighten the fixing screws

Step 2: Joint treatment

  • Apply silicone glue at the joints
  • Stick reinforced aluminum tape
  • Check for tightness

Step 3: Finishing

  • Install additional accessories
  • Overall check
  • Clean and tidy up

6. Quality control

Testing criteria:

  • Tightness of joints
  • Stability and rigidity
  • Quality of insulation
  • Surface finish

 

7. Storage and transportation

Step 1: Packing

  • Wrap the corners
  • Information labeling
  • Safe packaging

Step 2: Shipping

  • Streamline
  • Avoid collision
  • Protection while on the move

 

8. Important notes in production

Technically:

  • Ensuring accuracy in measurement
  • Check the joints carefully.
  • Ensures perfect sealing

About safety:

  • Use protective equipment
  • Follow safety procedures
  • Check equipment before use

About quality:

  • Check input materials
  • Ensure production standards
  • Final product inspection

#SaoViet #ongGio #ChatLuongCao #MadeInVietnam #CongNghiepVietNam #DieuHoaSaoViet #ongGioChongChay #AnToanChayNo #HVACSystem #CongNghiepHaiPhong